Please Note: This is a guide only.
Some items and descriptions may vary from that which is
specified.
Airport Oaks is a rapidly expanding, large, modern industrial
hub strategically located adjacent to Auckland International
Airport. Airpark Drive is shown to be a principal through
road within Airport Oaks, under the revised Airport roading
layout. The project at number 17 enjoys superb road exposure
and is situated close to George Bolt Drive, the main road
to the Airport from Auckland City. It also enjoys the benefit
of adjacent high profile well established companies in modern
buildings. With the Environment Court approval of the second
runway, Airpark Drive is even more strategically located
to the action. The old adage of ‘location location
location’ certainly applies here.
The new complex at 17 comprises 9 high quality industrial
units, the sizes of which are shown in the accompanying
schedule. This is no ordinary industrial/commercial complex,
but designed as an aesthetically pleasing ‘up market’
development, with which the owners and occupiers will be
proud to be associated. In order to maintain a high standard
of occupancy there will be some restrictions within the
Body Corp rules on the type of usage that is permissible
and signage positioning will be similarly limited. The ongoing
standard of quality and presentation is addressed by the
use of professional Body Corporate Managers.
Extra care has been taken to ensure versatility of design.
All offices are designed with unrestricted views out, however
there is restricted sight intrusion by the provision of
lightly tinted glass windows. A professional colour consultant
has been contracted to provide modern sympathetic colour
schemes. Office/showroom expansion, if required, has been
allowed for by the provision to extend into the warehouse
areas. All offices are air conditioned. Two separate wc
areas, have been designed into each Unit. Additionally each
Unit contains a shower. A full security fence along the
road frontage complete with remotely operated security gates
on both entrances ensures the owners/lessees peace of mind
at night and after hours.

Building Aesthetics
The design has been created by award winning Commercial
Architects, AQUA Architects, to provide a striking visual
aesthetic with a user friendly practical application. This,
combined with a comprehensive planting program, plus the
generous use of footway pavers, has combined to create an
aesthetically attractive yet practical whole.
Planting
The complex is to be planted with shrubs and ground covers,
particularly along the Airpark Drive frontage; whilst being
cognisant of the requirement for minimum ongoing maintenance
and upkeep.
Stud Height
Volume (vertical air space) as well as square area has been
considered in this complex. Thus the stud heights in the
factory areas have a minimum clear height of 5.75 and 7.0
meters, dependant on Unit sizes. First floor offices are
all 2.7meter stud height.
Front Office Entry
Double entrance doors are set back to form a recess under
the wide parapet soffits, forming the underside of the office
above. This provides for visitor shelter and excellent weathering.
Truck Access Doors
A full height (4.8m) truck access door has been provided
in each of factories 4 to 9, with a functional, attractive
Parapet canopy over each truck access door. Double access
doors enhance Units 1 to 3 with a functional 3.4m deep aesthetically
attractive steel strut canopy over both.
Car Parking
Generous car parking has been
provided, with allocated parks for each unit. Ratios are
as per those called for in the MCC Ordinances.
Container Parking
40ft container parking is available
outside each of the double doors of Units 1 to 3. Containers
may be parked over the carparks outside each of Units 4
to 9.
Turning Radii
Vehicular turning radii has been designed
in accordance with strict Australian design rules, conforming
to MCC ordinance requirements in all respects. Twin road
entrances have been provided to enhance vehicular movements
and to eliminate any possible congestion.
Precast Slab Walls
All walls as shown on the plans in concrete, including boundary
and intertenancy walls, are solid precast concrete, smooth
faced, with visible exterior walls painted, finished at
the tops to form an aesthetic even top line. All intertenancy
walls are smooth faced, unpainted.
First Floor Office Floors
Units 1 & 9 only; concrete floors covered in commercial
grade carpet and lino as required.
Steel work
Steel portals form the main structure for both the buildings
and mezzanine offices (see cross sectional plan).
Office Windows/Doors
All aluminium framed, as shown on plan, of solid profile,
silver powdercoat finished.
Office Parapets & Spandrels
All Units including 2 level office wall cladding, finished
in silver ‘Alupanel’ or similar type cladding.
Roof structure
Steel portal beams and galvanised roll formed steel roof
structure, with ‘Trimdec’ or similar roofing.
Truck access doors
4.8m high electrically operated galvanised powder coated
steel roller doors.
Natural lighting
Ample natural roof lighting has been designed into the factory/warehouse
areas, creating a safer working environment and minimized
lighting costs.

Each unit contains separate wc’s and handbasin’s
to service office and warehouse areas separately. A moulded
shower box and hinged door is to be installed complete with
CP slide shower and mixer set. The entire office area is
to be carpeted in a modern aesthetically attractive commercial
grade carpet. Wet areas to be laid in vinyl. All interior
décor to be colour coordinated in a modern theme;
colours by colour consultant. A stainless steel tub with
cold water supply will be located in the factory/warehouse
area.

All office and amenity walls gib lined, flush stopped and
painted to F4 paint quality. Interior doors and jambs painted
as per walls. Note; wet areas will have applicable wet area
linings.
Ceilings : Office area to be pre finished suspended ceilings.
Amenities areas to be gib,stopped and painted in the approved
manner to F4 paint quality.

Main kitchens : Stainless steel or ‘Domani’
type proprietary bench tops with twin ss sinks. High quality
cabinetry, complete with supplied and installed silver faced
dishwasher, sink waste disposal, and silver microwave in
custom cabinet above.

Units 1 & 9 only; 1.2m wide timber or steel with quality
steel commercial contemporary handrails and infill panelsof
expanded metal or similar. Treads, commercial carpet or
lino, as required.

Layout Plan
Standard wiring to areas as shown on electrical layout plan.
3 Phase Power
60 amp 3 phase power wired to mains board ready for utilising
as required.
Lighting
Diffuser trough lights throughout suspended ceiling office
areas.
Factory area, 400 watt Metal Hallide Hi Bays providing excellent
evenly spread light intensity.
1 x double auto security light positioned adjacent to the
front doors of the office and vehicular entrances..
Alarm
Hard wired to accommodate
an integrated burglar alarm system (burglar alarm not supplied).

Piping
Copper hot and cold water piping throughout.
Fittings
All tap fixtures and fittings in polished chrome, with single
mixers throughout. WC’s in white porcelain pans and
matching dual system cisterns, complete with chrome plated
tap fittings.
Hot Water
Hot water cylinder 135 litre mains pressure.

Driveways
Commercial grade hot mix asphalt, to provide a hard wearing
surface for turning trucks.
Carparks
Concrete pavers laid in areas directly in front of offices.
Remaining areas in commercial grade hot mix asphalt, with
individual parks denoted by painted lines.
Kerbs
Concrete kerbs bordering garden areas etc.
Pavers
Concrete footway pavers to be laid to some pedestrian ways
and approaches to office front entries or ramps. Approved
tiles to be laid in recessed areas adjacent to front entry
doors, carrying through to threshold area inside front double
doors.

An attractive dual sided roadside signboard will be positioned
as shown on plan, complete with a panel for each units use
to sign write. Additionally a sign of a pre set dimension
may be placed above each unit’s office and vehicular
entries, subject to Body Corp approval.

Security Fence/Gate
A proprietary steel and mesh security fence, approx 2m in
height, will be installed along the road frontage boundary.
A secure, lockable electric auto sliding security gate will
be installed across the driveway, with portable remote operation.
Such gate to be opened during all business hours and closed
at night.
Security Lights
Sensor lights will be located at all office and factory
door entrances. Flood lights will be fitted strategically
to keep the site vehicular areas lit at night. |